Triple

T15024298
Position Surface form Disambiguated ID Type / Status
Subject AP-2 motorway E378168 entity
Predicate instanceOf P0 FINISHED
Object toll motorway C3789 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: toll motorway
Context triple: [AP-2 motorway, instanceOf, toll motorway]
  • A. toll highway
    A toll highway is a high-speed road where drivers must pay a fee, typically at toll booths or electronically, to use the roadway for travel.
  • B. toll road chosen
    A toll road is a roadway for which drivers must pay a fee, typically at designated points or electronically, to use its infrastructure.
  • C. motorway
    A motorway is a high-capacity, multi-lane road designed for fast, long-distance vehicular travel with controlled access and no at-grade intersections.
  • D. toll bridge
    A toll bridge is a bridge where users must pay a fee to cross, typically to fund its construction, maintenance, or operation.
  • E. highway
    A highway is a major public road designed for high-speed, long-distance vehicular travel, typically featuring multiple lanes, limited access points, and safety infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cd46b2c819090d054c27787f677 completed April 10, 2026, 2:13 a.m.
Created at: April 10, 2026, 2:56 a.m.