Triple

T1499813
Position Surface form Disambiguated ID Type / Status
Subject Qualcomm E29770 entity
Predicate instanceOf P0 FINISHED
Object Semiconductor company C3679 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Semiconductor company
Context triple: [Qualcomm, instanceOf, Semiconductor company]
  • A. Fabless semiconductor company chosen
    A fabless semiconductor company is a business that designs and sells integrated circuits and other semiconductor devices while outsourcing the actual manufacturing to specialized fabrication plants (foundries).
  • B. Consumer electronics company
    A consumer electronics company is a business that designs, manufactures, markets, and sells electronic devices and gadgets for everyday personal and household use.
  • C. semiconductor manufacturing facility
    A semiconductor manufacturing facility is a highly controlled industrial plant where raw silicon wafers are processed through complex, precise, and cleanroom-based fabrication steps to produce integrated circuits and microchips.
  • D. manufacturing company
    A manufacturing company is an organization that transforms raw materials or components into finished goods through industrial processes, machinery, and labor for sale to other businesses or consumers.
  • E. CMOS microprocessor
    A CMOS microprocessor is a central processing unit implemented using complementary metal-oxide-semiconductor technology, providing high integration, low power consumption, and reliable digital computation on a single chip.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a498dba1d8819093b46a3a8d2485f1 completed March 1, 2026, 7:51 p.m.
Created at: March 1, 2026, 8:12 p.m.