Triple

T14917262
Position Surface form Disambiguated ID Type / Status
Subject PRR K2 E371411 entity
Predicate predecessorOf P97 FINISHED
Object PRR K4s E76330 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: PRR K4s | Statement: [PRR K2, predecessorOf, PRR K4s]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: PRR K4s
Context triple: [PRR K2, predecessorOf, PRR K4s]
  • A. PRR K4s chosen
    The PRR K4s was a class of iconic 4-6-2 "Pacific" steam locomotives that served as the primary passenger power for the Pennsylvania Railroad in the first half of the 20th century.
  • B. PRR K2
    The PRR K2 was an early class of steam locomotives used by the Pennsylvania Railroad, serving as a predecessor to the more famous K4s Pacific-type engines.
  • C. PRR E8
    The PRR E8 was a class of experimental 4-4-2 "Atlantic" type steam locomotives built by the Pennsylvania Railroad in the early 20th century to test high-speed passenger service concepts.
  • D. EMD F40PH
    The EMD F40PH is a widely used four-axle diesel-electric passenger locomotive built by Electro-Motive Division, best known for its long service on North American commuter and intercity railroads.
  • E. EMD GP40
    The EMD GP40 is a four-axle diesel-electric locomotive built by Electro-Motive Division in the late 1960s and early 1970s, widely used by North American railroads for freight service.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cc7ea3481908228b5acb7d06f12 completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69ded62038508190946499cd3552990e completed April 15, 2026, 12:04 a.m.
NED1 Entity disambiguation (via context triple) batch_69fe72bf2120819099df39bdc1da691b completed May 8, 2026, 11:33 p.m.
Created at: April 10, 2026, 2:32 a.m.