Triple
T14817360
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | River Mill Dam |
E348351
|
entity |
| Predicate | isPartOf |
P10
|
FINISHED |
| Object | Clackamas River hydropower system |
E1091914
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Clackamas River hydropower system | Statement: [River Mill Dam, isPartOf, Clackamas River hydropower system]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Clackamas River hydropower system Context triple: [River Mill Dam, isPartOf, Clackamas River hydropower system]
-
A.
Clackamas River Hydroelectric Project
chosen
The Clackamas River Hydroelectric Project is a hydroelectric power system on Oregon’s Clackamas River that includes multiple dams and facilities generating renewable electricity.
-
B.
Columbia River hydropower system
The Columbia River hydropower system is an extensive network of dams and generating facilities that provides a major share of the Pacific Northwest’s electricity while also supporting irrigation, navigation, and flood control.
-
C.
Mokelumne River Project (PG&E hydroelectric system)
The Mokelumne River Project is a Pacific Gas and Electric Company hydroelectric system that harnesses the Mokelumne River through dams, reservoirs, and powerhouses to generate electricity and provide water storage in California.
-
D.
Snake River hydropower system
The Snake River hydropower system is a network of dams and related infrastructure along the Snake River that generates hydroelectric power, supports irrigation, and influences regional water management and ecosystems in the Pacific Northwest.
-
E.
Deschutes Project
The Deschutes Project is a U.S. Bureau of Reclamation irrigation and water management development in central Oregon that supplies water for agriculture, municipalities, and wildlife habitat along the Deschutes River basin.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d822eb8f588190bf53445e730a934f |
completed | April 9, 2026, 10:06 p.m. |
| NER | Named-entity recognition | batch_69decfe2c1ec81908b3dff7a5d0e85d0 |
completed | April 14, 2026, 11:38 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69fe3897691c819085ef89480e730723 |
completed | May 8, 2026, 7:25 p.m. |
Created at: April 10, 2026, 1:50 a.m.