Triple

T14735798
Position Surface form Disambiguated ID Type / Status
Subject Glasgow, Kentucky E346203 entity
Predicate hasTransportation P105 FINISHED
Object Kentucky Route 80 E245063 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kentucky Route 80 | Statement: [Glasgow, Kentucky, hasTransportation, Kentucky Route 80]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kentucky Route 80
Context triple: [Glasgow, Kentucky, hasTransportation, Kentucky Route 80]
  • A. Kentucky Route 80 chosen
    Kentucky Route 80 is a major east–west highway spanning much of Kentucky, connecting numerous towns and cities across the southern part of the state.
  • B. Kentucky Route 88
    Kentucky Route 88 is a state highway in Kentucky that serves as an important east–west connector through rural communities, including parts of Hart County.
  • C. Kentucky Route 70
    Kentucky Route 70 is an east–west state highway in Kentucky that spans much of the state, connecting numerous small towns and rural areas.
  • D. Kentucky Route 84
    Kentucky Route 84 is a state highway in Kentucky that runs through central parts of the state, connecting communities such as Hodgenville and serving as a regional connector route.
  • E. Kentucky Route 48
    Kentucky Route 48 is a state highway in Kentucky that connects the city of Bloomfield with other nearby communities and regional routes.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822e6f1c88190bc494d491a907114 completed April 9, 2026, 10:06 p.m.
NER Named-entity recognition batch_69dec73114cc819088e1101b689fc70b completed April 14, 2026, 11:01 p.m.
NED1 Entity disambiguation (via context triple) batch_69fe24ac17888190bda346df75d37620 completed May 8, 2026, 6 p.m.
Created at: April 10, 2026, 1:29 a.m.