Triple

T14685864
Position Surface form Disambiguated ID Type / Status
Subject South Coast Line E344905 entity
Predicate instanceOf P0 FINISHED
Object interurban rail service C17649 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: interurban rail service
Context triple: [South Coast Line, instanceOf, interurban rail service]
  • A. interurban railroad chosen
    An interurban railroad is an electric railway system that provides passenger and sometimes freight service between cities and towns, typically operating on dedicated tracks or street-running routes over medium distances.
  • B. suburban commuter train
    A suburban commuter train is a passenger rail service designed to transport people efficiently between residential suburbs and urban centers, typically operating on fixed schedules with frequent stops during peak travel times.
  • C. commuter rail line
    A commuter rail line is a passenger train service that operates on fixed tracks and schedules to connect suburban or outlying areas with a central city, primarily serving daily work and school commuters.
  • D. rapid transit line
    A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
  • E. passenger rail service
    Passenger rail service is a transportation system that operates trains to carry people between locations on a scheduled basis, typically offering various classes of comfort and amenities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822e34b348190ada4d1cdb6c7c226 completed April 9, 2026, 10:06 p.m.
Created at: April 10, 2026, 1:28 a.m.