Triple

T14667049
Position Surface form Disambiguated ID Type / Status
Subject Chennai MRTS E344405 entity
Predicate instanceOf P0 FINISHED
Object mass rapid transit system C911 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: mass rapid transit system
Context triple: [Chennai MRTS, instanceOf, mass rapid transit system]
  • A. rapid transit network
    A rapid transit network is an integrated system of high-capacity, high-frequency urban rail or bus lines designed to move large numbers of passengers quickly and efficiently across a metropolitan area.
  • B. rapid transit line
    A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
  • C. rapid rail system
    A rapid rail system is a high-speed, high-capacity railway network designed to transport large numbers of passengers quickly and efficiently between urban or regional destinations using dedicated tracks and frequent service.
  • D. public transit system chosen
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • E. continuous transport system
    A continuous transport system is a material handling arrangement that moves goods or resources in an uninterrupted flow along a fixed path using devices such as conveyors, pipelines, or automated tracks.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822e283fc8190a0e4c235cf880052 completed April 9, 2026, 10:06 p.m.
Created at: April 10, 2026, 1:27 a.m.