Triple

T1465716
Position Surface form Disambiguated ID Type / Status
Subject Oak Lawn, Illinois E27016 entity
Predicate near P350 FINISHED
Object Interstate 55 E38193 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 55 | Statement: [Oak Lawn, Illinois, near, Interstate 55]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 55
Context triple: [Oak Lawn, Illinois, near, Interstate 55]
  • A. Interstate 55 chosen
    Interstate 55 is a major north–south U.S. highway running from Louisiana to Illinois, connecting cities such as New Orleans, Memphis, and Chicago.
  • B. Interstate 49
    Interstate 49 is a major north–south U.S. Interstate Highway running through multiple states in the central United States, including Missouri.
  • C. Interstate 59
    Interstate 59 is a major U.S. highway running from Louisiana to Georgia, serving as a key north–south transportation corridor through the Deep South.
  • D. Interstate 65
    Interstate 65 is a major north–south U.S. highway running through the central United States, connecting the Gulf Coast to the Midwest and serving key cities such as Mobile, Birmingham, Nashville, and Indianapolis.
  • E. Interstate 496
    Interstate 496 is an auxiliary Interstate Highway that serves as a key urban connector and bypass route through Lansing, Michigan.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a496d25d6881909dbd84f86d763992 completed March 1, 2026, 7:43 p.m.
NER Named-entity recognition batch_69a4c5bb4e288190997c7e8985e9a2bd completed March 1, 2026, 11:03 p.m.
NED1 Entity disambiguation (via context triple) batch_69c761601814819092889a7d6ba74a02 completed March 28, 2026, 5:04 a.m.
Created at: March 1, 2026, 8:01 p.m.