Triple
T14632516
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lancy-Bachet railway station |
E343516
|
entity |
| Predicate | railwayLine |
P848
|
FINISHED |
| Object | CEVA line |
E127785
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: CEVA line | Statement: [Lancy-Bachet railway station, railwayLine, CEVA line]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: CEVA line Context triple: [Lancy-Bachet railway station, railwayLine, CEVA line]
-
A.
CEVA line
chosen
The CEVA line is a cross-border rail link connecting Geneva and Annemasse that forms the core backbone of the Léman Express regional network around Lake Geneva.
-
B.
Hexagon DSP
Hexagon DSP is Qualcomm’s proprietary digital signal processor architecture designed to efficiently handle complex multimedia, AI, and signal-processing tasks in mobile and embedded devices.
-
C.
C Line
The C Line is a local New York City Subway service that runs along the Eighth Avenue Line in Manhattan and through parts of Brooklyn and Queens.
-
D.
C Line
The C Line was a light rail service in Denver, Colorado, that operated as part of the Regional Transportation District’s rail network.
-
E.
C Line
The C Line is a light rail route in the Los Angeles Metro Rail system that runs primarily along the I-105 freeway corridor, connecting coastal and inland communities in the South Bay region.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d822dffc3c8190aa173b90761bffda |
completed | April 9, 2026, 10:06 p.m. |
| NER | Named-entity recognition | batch_69deb4aa7cb48190b008bd6b0e162c89 |
completed | April 14, 2026, 9:42 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69fda931834081909d90ec0479eca3f9 |
completed | May 8, 2026, 9:13 a.m. |
Created at: April 10, 2026, 1:26 a.m.