Triple

T14624868
Position Surface form Disambiguated ID Type / Status
Subject Kariba Dam wall E343318 entity
Predicate operator P179 FINISHED
Object ZESCO E352655 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: ZESCO | Statement: [Kariba Dam wall, operator, ZESCO]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: ZESCO
Context triple: [Kariba Dam wall, operator, ZESCO]
  • A. ZESCO chosen
    ZESCO is Zambia’s state-owned electricity utility company responsible for generating, transmitting, and distributing electric power across the country.
  • B. Zimbabwe Power Company
    Zimbabwe Power Company is the state-owned utility responsible for generating electricity in Zimbabwe, operating major power stations including the Kariba hydroelectric facilities.
  • C. Zomba Group of Companies
    Zomba Group of Companies was a major music entertainment conglomerate best known for its influential Jive Records label, which launched and managed the careers of numerous pop and R&B superstars.
  • D. Energy Regulation Board of Zambia
    The Energy Regulation Board of Zambia is the national authority responsible for overseeing and regulating the country’s energy sector, including electricity, petroleum, and other energy services.
  • E. ZESA Holdings
    ZESA Holdings is Zimbabwe’s state-owned electricity utility company responsible for power generation, transmission, and distribution across the country.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822dffc3c8190aa173b90761bffda completed April 9, 2026, 10:06 p.m.
NER Named-entity recognition batch_69deb468acc4819083b7e818d5cec809 completed April 14, 2026, 9:40 p.m.
NED1 Entity disambiguation (via context triple) batch_69fdd5d0514081908c2bdc4fb77b1a7a completed May 8, 2026, 12:23 p.m.
Created at: April 10, 2026, 1:26 a.m.