Triple

T14624846
Position Surface form Disambiguated ID Type / Status
Subject Kariba Dam wall E343318 entity
Predicate locatedNear P294 FINISHED
Object Kariba E68349 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kariba | Statement: [Kariba Dam wall, locatedNear, Kariba]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kariba
Context triple: [Kariba Dam wall, locatedNear, Kariba]
  • A. Kariba Dam
    Kariba Dam is a massive hydroelectric dam on the Zambezi River between Zambia and Zimbabwe, forming one of the world’s largest man-made lakes and serving as a key source of power for the region.
  • B. Kariba, Zimbabwe
    Kariba, Zimbabwe is a lakeside town on the shores of Lake Kariba known for its hydroelectric heritage, wildlife-rich surroundings, and role as a major tourism and fishing hub.
  • C. Batoka Gorge
    Batoka Gorge is a steep, rugged chasm carved by the Zambezi River just downstream of Victoria Falls on the border between Zambia and Zimbabwe.
  • D. Kariba Gorge chosen
    Kariba Gorge is a steep, narrow canyon on the Zambezi River best known as the site of the Kariba Dam and Lake Kariba on the border between Zambia and Zimbabwe.
  • E. Kafue Gorge Dam
    Kafue Gorge Dam is a major hydroelectric power facility on the Kafue River in Zambia, providing a significant portion of the country’s electricity supply.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822dffc3c8190aa173b90761bffda completed April 9, 2026, 10:06 p.m.
NER Named-entity recognition batch_69deb468acc4819083b7e818d5cec809 completed April 14, 2026, 9:40 p.m.
NED1 Entity disambiguation (via context triple) batch_69fe968124d481909dd89dd9282788b7 completed May 9, 2026, 2:05 a.m.
Created at: April 10, 2026, 1:26 a.m.