Triple

T14624754
Position Surface form Disambiguated ID Type / Status
Subject Lake Kariba E343316 entity
Predicate formedBy P972 FINISHED
Object Kariba Dam E343315 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kariba Dam | Statement: [Lake Kariba, formedBy, Kariba Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kariba Dam
Context triple: [Lake Kariba, formedBy, Kariba Dam]
  • A. Kariba Dam chosen
    Kariba Dam is a massive hydroelectric dam on the Zambezi River between Zambia and Zimbabwe, forming one of the world’s largest man-made lakes and serving as a key source of power for the region.
  • B. Batoka Gorge
    Batoka Gorge is a steep, rugged chasm carved by the Zambezi River just downstream of Victoria Falls on the border between Zambia and Zimbabwe.
  • C. Kafue Gorge Dam
    Kafue Gorge Dam is a major hydroelectric power facility on the Kafue River in Zambia, providing a significant portion of the country’s electricity supply.
  • D. Diama Dam
    Diama Dam is a low-head dam on the lower Senegal River near the Senegal–Mauritania border, built primarily to prevent saltwater intrusion and support irrigation and navigation in the region.
  • E. Roseires Dam
    Roseires Dam is a major hydroelectric and irrigation dam on the Blue Nile in Sudan, crucial for water storage, power generation, and flood control in the region.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822dffc3c8190aa173b90761bffda completed April 9, 2026, 10:06 p.m.
NER Named-entity recognition batch_69deb468acc4819083b7e818d5cec809 completed April 14, 2026, 9:40 p.m.
NED1 Entity disambiguation (via context triple) batch_69fe6b40633481909882645f73d3e2c6 completed May 8, 2026, 11:01 p.m.
Created at: April 10, 2026, 1:26 a.m.