Triple

T14580772
Position Surface form Disambiguated ID Type / Status
Subject Series E6 Shinkansen E342185 entity
Predicate preSeriesTestingStart P109803 FINISHED
Object 2010 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2010 | Statement: [Series E6 Shinkansen, preSeriesTestingStart, 2010]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: preSeriesTestingStart
Context triple: [Series E6 Shinkansen, preSeriesTestingStart, 2010]
  • A. seriesRunStart
    Indicates the point in time or event at which a particular series or sequence of related items begins.
  • B. preServiceStatus
    Indicates the condition or state of an entity before a particular service or operation is performed on it.
  • C. preLaunchName
    Indicates the name assigned to something before its official or public launch.
  • D. preProductionUseStart chosen
    Indicates the point in time when something begins being used in a pre-production or testing environment.
  • E. trialServiceStart
    Indicates the point in time when a trial service or trial period for a service begins.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822ddc0f081909cd8163c7de298cd completed April 9, 2026, 10:06 p.m.
NER Named-entity recognition batch_69deb41e71748190a1deacc819dd26d3 completed April 14, 2026, 9:39 p.m.
PD Predicate disambiguation batch_69de656a953481909a4645b004c40de7 completed April 14, 2026, 4:03 p.m.
Created at: April 10, 2026, 1:24 a.m.