Triple

T14570571
Position Surface form Disambiguated ID Type / Status
Subject 2nd Ring Road (Beijing) E341899 entity
Predicate instanceOf P0 FINISHED
Object road infrastructure in Beijing C2978 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: road infrastructure in Beijing
Context triple: [2nd Ring Road (Beijing), instanceOf, road infrastructure in Beijing]
  • A. road infrastructure chosen
    Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
  • B. road in Shanghai
    A road in Shanghai is a transportation corridor within the city’s dense urban fabric that supports mixed traffic—vehicles, buses, bicycles, and pedestrians—while integrating local infrastructure, commercial activity, and municipal regulations specific to Shanghai.
  • C. road network
    A road network is an interconnected system of roads, intersections, and related infrastructure that enables the movement of vehicles and pedestrians between different locations.
  • D. transport infrastructure network
    A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
  • E. road in Berlin
    A road in Berlin is a public thoroughfare within the city’s urban network that facilitates vehicular, bicycle, and pedestrian movement while integrating with Berlin’s historical layout, public transit, and zoning infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822dcc6248190bed689984bceb0e2 completed April 9, 2026, 10:06 p.m.
Created at: April 10, 2026, 1:23 a.m.