Triple
T1455439
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lincoln Tunnel |
E31386
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | underwater tunnel |
C4139
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: underwater tunnel Context triple: [Lincoln Tunnel, instanceOf, underwater tunnel]
-
A.
road tunnel
chosen
A road tunnel is an underground or enclosed passageway constructed to allow vehicular traffic to pass through obstacles such as mountains, hills, or urban areas while maintaining a continuous roadway.
-
B.
rail tunnel
A rail tunnel is an underground or enclosed passage constructed to allow trains to travel through obstacles such as mountains, hills, or urban areas while maintaining a continuous railway route.
-
C.
underground structure
An underground structure is a man-made construction built below the earth’s surface to provide space, protection, or support for various human activities or infrastructure.
-
D.
roadway underpass
A roadway underpass is a structure that allows a road to pass beneath another road, railway, or obstacle, providing grade separation and uninterrupted traffic flow.
-
E.
cavern hall
A cavern hall is a vast, naturally formed underground chamber characterized by high ceilings, expansive open space, and geological features such as stalactites, stalagmites, and rock formations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a499171a28819085b993a3ac78e363 |
completed | March 1, 2026, 7:52 p.m. |
Created at: March 1, 2026, 8 p.m.