Triple

T14554010
Position Surface form Disambiguated ID Type / Status
Subject Tete Province E341490 entity
Predicate hasInfrastructure P2560 FINISHED
Object Cahora Bassa Dam E70573 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Cahora Bassa Dam | Statement: [Tete Province, hasInfrastructure, Cahora Bassa Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Cahora Bassa Dam
Context triple: [Tete Province, hasInfrastructure, Cahora Bassa Dam]
  • A. Cahora Bassa Dam chosen
    Cahora Bassa Dam is a major hydroelectric dam in Mozambique that forms one of Africa’s largest artificial lakes and supplies significant power to the region.
  • B. Kariba Dam
    Kariba Dam is a massive hydroelectric dam on the Zambezi River between Zambia and Zimbabwe, forming one of the world’s largest man-made lakes and serving as a key source of power for the region.
  • C. Roseires Dam
    Roseires Dam is a major hydroelectric and irrigation dam on the Blue Nile in Sudan, crucial for water storage, power generation, and flood control in the region.
  • D. Chivero Dam
    Chivero Dam is a major reservoir in Zimbabwe that supplies water to Harare and supports recreation, fishing, and wildlife in the surrounding Lake Chivero Recreational Park.
  • E. Itumbiara Dam
    Itumbiara Dam is a large hydroelectric dam in Brazil known for generating significant electricity and forming one of the country’s major artificial reservoirs.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822db9c8481908213ceb39585f792 completed April 9, 2026, 10:06 p.m.
NER Named-entity recognition batch_69deb2f00cec8190a7b6482d18b9a216 completed April 14, 2026, 9:34 p.m.
NED1 Entity disambiguation (via context triple) batch_69fda9124af481908f43e3b541568e26 completed May 8, 2026, 9:12 a.m.
Created at: April 10, 2026, 1:23 a.m.