Triple
T14546184
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Office of the National Rail Safety Regulator |
E341297
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | rail safety regulator |
C34929
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: rail safety regulator Context triple: [Office of the National Rail Safety Regulator, instanceOf, rail safety regulator]
-
A.
railway industry body
A railway industry body is an organization that represents, coordinates, and sets standards or policies for companies and stakeholders involved in the rail transport sector.
-
B.
rail safety legislation
Rail safety legislation comprises the laws and regulations that govern the safe design, operation, maintenance, and oversight of railway systems to protect passengers, workers, and the public.
-
C.
railway infrastructure manager
A railway infrastructure manager is an entity responsible for the planning, construction, maintenance, operation, and safe management of railway tracks, signaling systems, and related fixed installations.
-
D.
public railway
A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
-
E.
rail
A rail is a long, rigid bar or track, typically made of metal or wood, used to guide, support, or confine movement along a fixed path.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d822db9c8481908213ceb39585f792 |
completed | April 9, 2026, 10:06 p.m. |
Created at: April 10, 2026, 1:22 a.m.