Triple

T1454589
Position Surface form Disambiguated ID Type / Status
Subject Strategic Arms Limitation Talks E31369 entity
Predicate instanceOf P0 FINISHED
Object arms control negotiation C2127 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: arms control negotiation
Context triple: [Strategic Arms Limitation Talks, instanceOf, arms control negotiation]
  • A. nuclear weapons crisis
    A nuclear weapons crisis is a high-stakes international confrontation in which the use or threatened use of nuclear arms becomes a realistic possibility, creating urgent risks of catastrophic escalation and intense diplomatic, military, and political pressure to resolve the conflict.
  • B. nuclear weapons program
    A nuclear weapons program is an organized, often state-led effort to research, develop, test, produce, and maintain nuclear warheads and their delivery systems for military deterrence or potential use.
  • C. multilateral negotiation process chosen
    A multilateral negotiation process is a structured series of interactions among three or more parties with differing interests, aimed at reaching mutually acceptable agreements through communication, bargaining, and compromise.
  • D. nuclear weapons proposal
    A nuclear weapons proposal is a formal plan or document outlining the development, acquisition, deployment, or modification of nuclear armaments, including their strategic rationale, technical specifications, and anticipated impacts.
  • E. missile defense program
    A missile defense program is an organized system of technologies, policies, and operations designed to detect, track, intercept, and neutralize incoming missiles before they reach their intended targets.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a499171a28819085b993a3ac78e363 completed March 1, 2026, 7:52 p.m.
Created at: March 1, 2026, 8 p.m.