Triple

T1444722
Position Surface form Disambiguated ID Type / Status
Subject New Source Performance Standards E31151 entity
Predicate instanceOf P0 FINISHED
Object emission standard C4305 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: emission standard
Context triple: [New Source Performance Standards, instanceOf, emission standard]
  • A. transportation standard
    A transportation standard is an agreed-upon set of rules, specifications, and protocols that ensure compatibility, safety, and efficiency across transportation systems, vehicles, and infrastructure.
  • B. engineering standard
    An engineering standard is a documented set of agreed-upon technical criteria, methods, and requirements intended to ensure safety, interoperability, quality, and consistency in engineering design, production, and operation.
  • C. official standard chosen
    An official standard is an authoritative, formally approved specification or guideline established by a recognized body to ensure consistency, compatibility, and quality across products, services, or processes.
  • D. port emissions reduction initiative
    A port emissions reduction initiative is a coordinated program of policies, technologies, and operational changes designed to lower air pollutants and greenhouse gas emissions from maritime, terminal, and landside activities within and around a port.
  • E. cement standard
    A cement standard is a defined specification or guideline that establishes the required properties, performance criteria, and testing methods for cement to ensure quality, safety, and consistency in construction applications.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4991633388190a4d61b5a98aa407a completed March 1, 2026, 7:52 p.m.
Created at: March 1, 2026, 8 p.m.