Triple
T14440950
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Apache OpenOffice |
E358080
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | office productivity suite |
C227
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: office productivity suite Context triple: [Apache OpenOffice, instanceOf, office productivity suite]
-
A.
Google office
A Google office is a modern, collaborative workspace designed by Google that combines advanced technology, flexible work areas, and employee-focused amenities to foster innovation and productivity.
-
B.
Microsoft Office feature
A Microsoft Office feature is a specific tool or capability within Office applications that enhances productivity by enabling users to create, edit, analyze, or present information more efficiently.
-
C.
public office
A public office is an official position of authority and responsibility within a government or public institution, held to serve the interests and welfare of the public under established laws and regulations.
-
D.
Internet suite
An Internet suite is an integrated software package that combines multiple internet-related tools—such as a web browser, email client, FTP client, and chat or news reader—into a single cohesive application.
-
E.
software
chosen
Software is a collection of programs, data, and instructions that tell a computer or digital device how to perform specific tasks or functions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8279402a88190821ffa39ae15bccf |
completed | April 9, 2026, 10:26 p.m. |
Created at: April 10, 2026, 1:18 a.m.