Triple

T14438849
Position Surface form Disambiguated ID Type / Status
Subject Jenkins E358036 entity
Predicate instanceOf P0 FINISHED
Object continuous integration tool C15486 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: continuous integration tool
Context triple: [Jenkins, instanceOf, continuous integration tool]
  • A. developer tool chosen
    A developer tool is a software application or utility designed to help programmers create, test, debug, and maintain code more efficiently.
  • B. collection of programming tools
    A collection of programming tools is an organized set of software utilities, libraries, and environments designed to assist developers in writing, testing, debugging, and maintaining code efficiently.
  • C. software build and distribution system
    A software build and distribution system automates compiling source code, packaging artifacts, and delivering them reliably to target environments or end users.
  • D. integration testing framework
    An integration testing framework is a software toolset that automates the execution and validation of tests across multiple interacting components or systems to ensure they work together correctly as a whole.
  • E. integrated development environment component
    An integrated development environment component is a modular tool or feature within an IDE that provides specific functionality—such as code editing, debugging, or project management—to support and streamline software development.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8279402a88190821ffa39ae15bccf completed April 9, 2026, 10:26 p.m.
Created at: April 10, 2026, 1:18 a.m.