Triple

T14418876
Position Surface form Disambiguated ID Type / Status
Subject Space Shuttle approach and landing tests E357527 entity
Predicate instanceOf P0 FINISHED
Object Space Shuttle test program C5891 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Space Shuttle test program
Context triple: [Space Shuttle approach and landing tests, instanceOf, Space Shuttle test program]
  • A. Space Shuttle mission chosen
    A Space Shuttle mission is a coordinated spaceflight operation using the Space Shuttle orbiter to transport crew, cargo, and conduct scientific or technical objectives in Earth orbit and beyond.
  • B. Space Shuttle payload module
    A Space Shuttle payload module is a specialized, modular structure designed to house, support, and interface scientific instruments, cargo, or satellites within the Shuttle’s payload bay for deployment or on-orbit operations.
  • C. NASA rocket engine test facility
    A NASA rocket engine test facility is a specialized complex equipped with infrastructure, instrumentation, and safety systems to ground-test and validate rocket engines under controlled, flight-like conditions.
  • D. Space Shuttle Endeavour
    Space Shuttle Endeavour is a retired NASA orbiter that served as a reusable spacecraft for transporting astronauts, satellites, and scientific payloads to and from low Earth orbit as part of the Space Shuttle program.
  • E. Space Shuttle subsystem
    A Space Shuttle subsystem is a distinct functional component or collection of components within the Space Shuttle that performs a specific role—such as propulsion, life support, guidance, or power management—to enable safe and effective mission operations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d82793421c8190861eb0e673b085de completed April 9, 2026, 10:26 p.m.
Created at: April 10, 2026, 1:18 a.m.