Triple

T14405370
Position Surface form Disambiguated ID Type / Status
Subject U-Bahnhof Seestraße E357181 entity
Predicate isPartOf P10 FINISHED
Object Nord-Süd-Tunnel der U6 E586025 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Nord-Süd-Tunnel der U6 | Statement: [U-Bahnhof Seestraße, isPartOf, Nord-Süd-Tunnel der U6]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Nord-Süd-Tunnel der U6
Context triple: [U-Bahnhof Seestraße, isPartOf, Nord-Süd-Tunnel der U6]
  • A. Berlin U-Bahn line U6
    Berlin U-Bahn line U6 is a major north–south underground metro line in Berlin that connects the northern district of Tegel with southern neighborhoods through the city center.
  • B. Tiergarten tunnel
    The Tiergarten tunnel is a major road and rail tunnel in central Berlin that carries traffic beneath the Tiergarten park, helping to connect key parts of the city’s transport network.
  • C. S6 Line
    The S6 Line is a rapid transit route within the Nanjing Metro system in Nanjing, China.
  • D. Berlin S-Bahn Nord-Süd-Tunnel chosen
    The Berlin S-Bahn Nord-Süd-Tunnel is a central underground railway tunnel in Berlin that carries multiple S-Bahn lines beneath the city’s core, connecting northern and southern suburban routes.
  • E. U6 line
    The U6 line is a route of the Frankfurt U-Bahn rapid transit system that connects various districts across the city, including central hubs such as Hauptwache.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d82793421c8190861eb0e673b085de completed April 9, 2026, 10:26 p.m.
NER Named-entity recognition batch_69de908804048190a4fe58afc2e0a5b6 completed April 14, 2026, 7:07 p.m.
NED1 Entity disambiguation (via context triple) batch_69fd5523267081908d972b60b6039528 completed May 8, 2026, 3:14 a.m.
Created at: April 10, 2026, 1:17 a.m.