Triple

T14388404
Position Surface form Disambiguated ID Type / Status
Subject Google Silicon team E356781 entity
Predicate instanceOf P0 FINISHED
Object hardware engineering team C4335 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: hardware engineering team
Context triple: [Google Silicon team, instanceOf, hardware engineering team]
  • A. engineering division chosen
    The engineering division is an organizational unit responsible for designing, developing, and maintaining technical systems, products, and infrastructure within a company or institution.
  • B. computer engineer
    A computer engineer is a professional who designs, develops, and integrates computer hardware and software systems to solve technical and practical problems.
  • C. computer engineering department
    A computer engineering department is an academic unit that focuses on the study, research, and teaching of hardware-software systems, including computer architecture, embedded systems, digital design, and related technologies.
  • D. systems engineer
    A systems engineer designs, integrates, and manages complex systems across their life cycles, ensuring that all components—technical, human, and organizational—work together effectively to meet specified requirements.
  • E. semiconductor engineer
    A semiconductor engineer designs, develops, and optimizes microelectronic devices and integrated circuits by applying principles of materials science, electrical engineering, and manufacturing processes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d827927c988190ad98bb0360981783 completed April 9, 2026, 10:26 p.m.
Created at: April 10, 2026, 1:16 a.m.