Triple
T14388019
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | GSMA Remote SIM Provisioning specifications |
E356773
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | GSMA specification |
C2787
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: GSMA specification Context triple: [GSMA Remote SIM Provisioning specifications, instanceOf, GSMA specification]
-
A.
3GPP standardized parameter
A 3GPP standardized parameter is a formally defined technical value or setting specified by the 3rd Generation Partnership Project to ensure interoperability, performance, and compliance across mobile communication systems and equipment.
-
B.
telecommunications standard
chosen
A telecommunications standard is an agreed-upon set of technical specifications and protocols that ensure compatibility, interoperability, and reliable communication across different telecom networks and devices.
-
C.
networking specification
A networking specification is a formal document that defines the protocols, formats, behaviors, and requirements governing how devices communicate and exchange data over a network.
-
D.
ITU-T Recommendation
An ITU-T Recommendation is an internationally agreed technical standard developed by the ITU Telecommunication Standardization Sector to ensure the interoperability, quality, and efficiency of global telecommunication networks and services.
-
E.
technology specification process
The technology specification process is the structured sequence of activities through which requirements are gathered, analyzed, and documented to define the technical standards, features, and constraints of a technology solution.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d827927c988190ad98bb0360981783 |
completed | April 9, 2026, 10:26 p.m. |
Created at: April 10, 2026, 1:16 a.m.