Triple

T1437068
Position Surface form Disambiguated ID Type / Status
Subject Pohela Boishakh E30580 entity
Predicate instanceOf P0 FINISHED
Object Bengali New Year C4029 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Bengali New Year
Context triple: [Pohela Boishakh, instanceOf, Bengali New Year]
  • A. New Year celebration chosen
    A New Year celebration is a festive event marking the transition from one year to the next, typically involving gatherings, countdowns, fireworks, and cultural or personal rituals of reflection and renewal.
  • B. harvest festival
    A harvest festival is a communal celebration held at the end of the growing season to give thanks for and enjoy the gathered crops through feasting, rituals, and cultural traditions.
  • C. public holiday
    A public holiday is a legally designated day on which work and school are generally suspended to allow the population to observe cultural, historical, religious, or national events.
  • D. Veda
    Veda is a conceptual class representing a comprehensive body of sacred or foundational knowledge that serves as an authoritative source for understanding and guiding a particular domain or system.
  • E. annual festival
    An annual festival is a recurring, once-a-year event, often rooted in cultural, religious, or community traditions, that brings people together for celebration, rituals, entertainment, and shared activities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a498fc69ec8190b61722bd4b67c4d2 completed March 1, 2026, 7:52 p.m.
Created at: March 1, 2026, 8 p.m.