Triple

T14360660
Position Surface form Disambiguated ID Type / Status
Subject Lake Gordon E356088 entity
Predicate partOf P40 FINISHED
Object Tasmanian hydroelectric system E1085265 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tasmanian hydroelectric system | Statement: [Lake Gordon, partOf, Tasmanian hydroelectric system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Tasmanian hydroelectric system
Context triple: [Lake Gordon, partOf, Tasmanian hydroelectric system]
  • A. Hydro Tasmania chosen
    Hydro Tasmania is Australia's largest producer of renewable energy, primarily generating hydroelectric power from Tasmania's extensive network of dams and power stations.
  • B. Burrinjuck Power Station
    Burrinjuck Power Station is a hydroelectric power facility in New South Wales, Australia, that generates electricity using water from Burrinjuck Dam on the Murrumbidgee River.
  • C. Tasmanian power grid
    The Tasmanian power grid is the integrated electricity generation, transmission, and distribution network that supplies power across the Australian island state of Tasmania, heavily reliant on hydroelectric resources.
  • D. Churchill River hydroelectric system
    The Churchill River hydroelectric system is a large-scale network of dams, reservoirs, and power stations in Labrador, Canada, developed to harness the Churchill River’s flow for electricity generation.
  • E. Snowy Hydro Scheme
    The Snowy Hydro Scheme is a large-scale hydroelectricity and irrigation complex in Australia’s Snowy Mountains, renowned as one of the country’s most significant engineering projects.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d82790a7e08190877e2d349b2e8d8e completed April 9, 2026, 10:26 p.m.
NER Named-entity recognition batch_69de8f54bfb08190a27c0d12731acec2 completed April 14, 2026, 7:02 p.m.
NED1 Entity disambiguation (via context triple) batch_69fd5bbd7cb881908b33b3aae4243f2e completed May 8, 2026, 3:42 a.m.
Created at: April 10, 2026, 1:15 a.m.