Triple

T1435338
Position Surface form Disambiguated ID Type / Status
Subject Asian side of Istanbul E30547 entity
Predicate hasTransport P1298 FINISHED
Object Marmaray rail line E130705 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Marmaray rail line | Statement: [Asian side of Istanbul, hasTransport, Marmaray rail line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Marmaray rail line
Context triple: [Asian side of Istanbul, hasTransport, Marmaray rail line]
  • A. Marmaray rail tunnel chosen
    The Marmaray rail tunnel is an undersea railway tunnel in Istanbul that connects the European and Asian sides of the city beneath the Bosporus Strait.
  • B. Ankara Metro
    Ankara Metro is the rapid transit system serving Turkey's capital city, providing urban rail transportation across Ankara and its surrounding districts.
  • C. Izmir Metro
    Izmir Metro is a rapid transit rail system serving the city of Izmir, Turkey, providing high-capacity urban transportation across key districts.
  • D. Yavuz Sultan Selim Bridge
    Yavuz Sultan Selim Bridge is a modern suspension bridge spanning the Bosphorus Strait in Istanbul, serving both road and rail traffic and symbolizing the city's connection between Europe and Asia.
  • E. Tunca Bridge
    Tunca Bridge is a historic Ottoman-era stone bridge spanning the Tunca River in Edirne, Turkey.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a498fc69ec8190b61722bd4b67c4d2 completed March 1, 2026, 7:52 p.m.
NER Named-entity recognition batch_69a4c50250b88190a0fcf3e0cbba0b1a completed March 1, 2026, 11 p.m.
NED1 Entity disambiguation (via context triple) batch_69ad017084908190a81a784ae4a53c21 completed March 8, 2026, 4:56 a.m.
Created at: March 1, 2026, 8 p.m.