Triple
T14284889
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Rainbow Bridge (approach and anchorage) |
E354143
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bridge anchorage structure |
C33733
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bridge anchorage structure Context triple: [Rainbow Bridge (approach and anchorage), instanceOf, bridge anchorage structure]
-
A.
suspension bridge
A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
-
B.
beam bridge
A beam bridge is a simple type of bridge consisting of a horizontal beam supported at its ends by piers or abutments, carrying loads primarily through bending.
-
C.
deck arch bridge
A deck arch bridge is a type of arch bridge where the roadway or deck is positioned on top of the arch structure, which supports the load from below.
-
D.
river bridge
A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
-
E.
concrete bridge
A concrete bridge is a structure built primarily from reinforced or prestressed concrete to span physical obstacles such as roads, rivers, or valleys, providing a durable pathway for vehicles, pedestrians, or rail traffic.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8278d25148190abf1a8c8f5f533ad |
completed | April 9, 2026, 10:26 p.m. |
Created at: April 10, 2026, 1:10 a.m.