Triple

T14244401
Position Surface form Disambiguated ID Type / Status
Subject 390th Air Service Group E353094 entity
Predicate instanceOf P0 FINISHED
Object air service group C33642 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: air service group
Context triple: [390th Air Service Group, instanceOf, air service group]
  • A. air support group
    An air support group is a military unit responsible for coordinating, providing, and sustaining air operations—such as close air support, reconnaissance, and transport—to assist ground and naval forces in achieving their objectives.
  • B. air cargo division
    The air cargo division is the organizational unit within an airline or logistics company responsible for managing, coordinating, and optimizing the transportation of freight and mail by air.
  • C. air transport service provider
    An air transport service provider is an organization that offers the commercial operation, management, and coordination of aircraft and related services to move passengers or cargo between locations.
  • D. air fleet
    An air fleet is a coordinated group of aircraft, typically organized under a single command, that operates together to conduct large-scale aerial missions or operations.
  • E. airmobile division
    An airmobile division is a military formation organized, trained, and equipped to be rapidly deployed and maneuvered by aircraft, primarily helicopters, to conduct combat and support operations.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8278adc7c8190a9218d69bce3c4e6 completed April 9, 2026, 10:26 p.m.
Created at: April 10, 2026, 1:08 a.m.