Triple

T14227372
Position Surface form Disambiguated ID Type / Status
Subject Itezhi-Tezhi Power Corporation Limited E352656 entity
Predicate basedOnInfrastructure P6820 FINISHED
Object Itezhi-Tezhi Dam E70872 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Itezhi-Tezhi Dam | Statement: [Itezhi-Tezhi Power Corporation Limited, basedOnInfrastructure, Itezhi-Tezhi Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Itezhi-Tezhi Dam
Context triple: [Itezhi-Tezhi Power Corporation Limited, basedOnInfrastructure, Itezhi-Tezhi Dam]
  • A. Itezhi-Tezhi Dam chosen
    Itezhi-Tezhi Dam is a major hydroelectric and water-regulation dam in Zambia that helps control flows and generate power along the Kafue River system, a key tributary of the Zambezi.
  • B. Bariri Dam
    Bariri Dam is a hydroelectric and river regulation structure located on Brazil’s Tietê River, contributing to regional power generation and water management.
  • C. Tantangara Dam
    Tantangara Dam is a major concrete gravity dam in New South Wales, Australia, built as part of the Snowy Mountains Scheme to store water for hydroelectric power generation and irrigation.
  • D. Rusape Dam
    Rusape Dam is a major reservoir in northeastern Zimbabwe that supplies water for irrigation, domestic use, and recreation to the town of Rusape and surrounding areas.
  • E. Baipaza Dam
    Baipaza Dam is a major hydroelectric dam in Tajikistan that harnesses the Vakhsh River to generate power and support regional water management.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: basedOnInfrastructure
Context triple: [Itezhi-Tezhi Power Corporation Limited, basedOnInfrastructure, Itezhi-Tezhi Dam]
  • A. usesInfrastructure chosen
    Indicates that one entity makes use of, depends on, or operates through the infrastructure provided or managed by another entity.
  • B. parallelInfrastructure
    Indicates that two or more infrastructure elements are arranged or operate in parallel to each other, typically serving similar functions simultaneously.
  • C. supportsInfrastructure
    Indicates that one entity provides resources, services, or capabilities that enable the operation, maintenance, or development of another entity’s infrastructure.
  • D. typicalInfrastructure
    Indicates that something is part of the standard or commonly expected infrastructure associated with a given context or entity.
  • E. basedOnNetwork
    Indicates that something is determined, derived, or operates according to a particular network or network-related characteristics.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8278adc7c8190a9218d69bce3c4e6 completed April 9, 2026, 10:26 p.m.
NER Named-entity recognition batch_69de622a48508190bbfedb762bd1674d completed April 14, 2026, 3:50 p.m.
NED1 Entity disambiguation (via context triple) batch_69fdd5bb9a5881908eac6153c7eb623e completed May 8, 2026, 12:23 p.m.
PD Predicate disambiguation batch_69de05bf069c8190b69f00f00f5eb126 completed April 14, 2026, 9:15 a.m.
Created at: April 10, 2026, 1:07 a.m.