Triple

T14209115
Position Surface form Disambiguated ID Type / Status
Subject Tramway T4 E352179 entity
Predicate instanceOf P0 FINISHED
Object tram-train line C11774 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: tram-train line
Context triple: [Tramway T4, instanceOf, tram-train line]
  • A. tram line chosen
    A tram line is a designated route, typically with fixed tracks and stops, along which trams operate to provide urban or suburban public transportation.
  • B. railroad line
    A railroad line is a fixed route consisting of tracks and associated infrastructure over which trains operate to transport passengers or freight between locations.
  • C. railway line
    A railway line is a fixed transportation route consisting of tracks, signaling, and related infrastructure along which trains operate between defined locations.
  • D. commuter rail line
    A commuter rail line is a passenger train service that operates on fixed tracks and schedules to connect suburban or outlying areas with a central city, primarily serving daily work and school commuters.
  • E. named train
    A named train is a specific passenger rail service distinguished by a unique name, branding, and often a consistent route and schedule.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8278a06e481908b5d6af0a8afe737 completed April 9, 2026, 10:26 p.m.
Created at: April 10, 2026, 1:05 a.m.