Triple
T14203803
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Danube–Tisa–Danube Canal |
E352032
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | artificial waterway system |
C6053
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: artificial waterway system Context triple: [Danube–Tisa–Danube Canal, instanceOf, artificial waterway system]
-
A.
engineered waterway
An engineered waterway is a human-made or heavily modified channel or system designed to control, convey, or manage water for purposes such as navigation, irrigation, drainage, flood control, or power generation.
-
B.
levee system
A levee system is an integrated network of embankments, floodwalls, and related structures designed to contain or redirect water to protect land and infrastructure from flooding.
-
C.
waterway network
chosen
A waterway network is an interconnected system of natural and artificial water channels (such as rivers, canals, and streams) designed or utilized for the movement, distribution, and management of water and waterborne transport.
-
D.
canal aqueduct
A canal aqueduct is a bridge-like structure that carries a navigable waterway over obstacles such as rivers, valleys, roads, or other canals.
-
E.
man-made basin
A man-made basin is an artificially constructed depression or container designed to hold or manage water or other liquids for purposes such as storage, irrigation, drainage, or industrial use.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d827894ac0819097803e57f3227b23 |
completed | April 9, 2026, 10:26 p.m. |
Created at: April 10, 2026, 1:05 a.m.