Triple

T14194151
Position Surface form Disambiguated ID Type / Status
Subject Meadowbank Dam E351789 entity
Predicate category P87 FINISHED
Object Derwent River power stations E351790 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Derwent River power stations | Statement: [Meadowbank Dam, category, Derwent River power stations]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Derwent River power stations
Context triple: [Meadowbank Dam, category, Derwent River power stations]
  • A. Burrinjuck Power Station
    Burrinjuck Power Station is a hydroelectric power facility in New South Wales, Australia, that generates electricity using water from Burrinjuck Dam on the Murrumbidgee River.
  • B. Blowering Power Station
    Blowering Power Station is a hydroelectric power facility in New South Wales, Australia, that forms part of the Snowy Mountains region’s renewable energy infrastructure.
  • C. Kettle Generating Station
    Kettle Generating Station is a major hydroelectric power plant on Manitoba’s Nelson River that forms part of the large-scale northern generating system supplying electricity to the province.
  • D. Arapuni Power Station
    Arapuni Power Station is a major hydroelectric power facility in New Zealand, located on the Waikato River and known for its large concrete arch dam and contribution to the national grid.
  • E. Derwent hydropower scheme chosen
    The Derwent hydropower scheme is a system of hydroelectric power stations and associated infrastructure that harnesses the flow of the River Derwent to generate renewable electricity.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d827894ac0819097803e57f3227b23 completed April 9, 2026, 10:26 p.m.
NER Named-entity recognition batch_69de61e0a52081908213aa6e548d4418 completed April 14, 2026, 3:48 p.m.
NED1 Entity disambiguation (via context triple) batch_69fd324b86748190b3e0a39383969cc7 completed May 8, 2026, 12:46 a.m.
Created at: April 10, 2026, 1:04 a.m.