Triple
T1415994
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Admiralty Arch |
E31918
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | ceremonial arch |
C2172
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: ceremonial arch Context triple: [Admiralty Arch, instanceOf, ceremonial arch]
-
A.
ceremonial bridge
A ceremonial bridge is a specially designed structure used primarily for symbolic, ritual, or commemorative crossings during formal events rather than for everyday transportation.
-
B.
triumphal arch
chosen
A triumphal arch is a monumental, freestanding structure with one or more arched passageways, built to commemorate significant victories, events, or individuals.
-
C.
ceremonial hall
A ceremonial hall is a large, formal space designed to host significant events, rituals, and gatherings such as weddings, graduations, and official ceremonies.
-
D.
ceremonial platform
A ceremonial platform is an elevated, often architecturally distinct structure designed as the focal stage for formal rituals, public rites, or symbolic performances.
-
E.
stone arch bridge
A stone arch bridge is a structure composed of curved stone arches that span a gap, using the compressive strength of masonry to support loads and provide passage over obstacles like rivers or valleys.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a49919a994819086528951bc224775 |
completed | March 1, 2026, 7:52 p.m. |
Created at: March 1, 2026, 7:59 p.m.