Triple

T14136279
Position Surface form Disambiguated ID Type / Status
Subject Guthega Dam E350302 entity
Predicate partOf P40 FINISHED
Object Snowy Mountains hydroelectric and irrigation project E67510 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Snowy Mountains hydroelectric and irrigation project | Statement: [Guthega Dam, partOf, Snowy Mountains hydroelectric and irrigation project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Snowy Mountains hydroelectric and irrigation project
Context triple: [Guthega Dam, partOf, Snowy Mountains hydroelectric and irrigation project]
  • A. Snowy Hydro Scheme chosen
    The Snowy Hydro Scheme is a large-scale hydroelectricity and irrigation complex in Australia’s Snowy Mountains, renowned as one of the country’s most significant engineering projects.
  • B. Ord River irrigation scheme
    The Ord River irrigation scheme is a major agricultural development in northern Western Australia that harnesses the Ord River’s water through dams and channels to support large-scale irrigated farming around Kununurra.
  • C. Churchill River hydroelectric system
    The Churchill River hydroelectric system is a large-scale network of dams, reservoirs, and power stations in Labrador, Canada, developed to harness the Churchill River’s flow for electricity generation.
  • D. Goldfields Water Supply Scheme
    The Goldfields Water Supply Scheme is a historic Australian engineering project that transports water over hundreds of kilometers from Perth to the arid Eastern Goldfields region of Western Australia.
  • E. Queanbeyan–Canberra water supply scheme
    The Queanbeyan–Canberra water supply scheme is a regional water management system that provides and regulates potable water for the Canberra and Queanbeyan area in southeastern Australia.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d827865f608190b311820428ae027b completed April 9, 2026, 10:26 p.m.
NER Named-entity recognition batch_69de610fb86c81909eb26bf9c13696ca completed April 14, 2026, 3:45 p.m.
NED1 Entity disambiguation (via context triple) batch_69fd4672bac8819085794c2554bd6e75 completed May 8, 2026, 2:12 a.m.
Created at: April 10, 2026, 12:18 a.m.