Triple
T1411091
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Wipro Limited |
E31805
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Consulting company |
C188
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Consulting company Context triple: [Wipro Limited, instanceOf, Consulting company]
-
A.
consulting organization
chosen
A consulting organization is a professional services entity that provides expert advice, analysis, and solutions to clients to improve their performance, solve specific problems, or achieve strategic objectives.
-
B.
computer services company
A computer services company is an organization that provides technical expertise, support, and solutions related to computer systems, software, networks, and IT infrastructure for individuals or other businesses.
-
C.
engineering firm
An engineering firm is a business organization that provides professional engineering services—such as design, analysis, consulting, and project management—to plan, develop, and implement technical solutions for clients in various industries.
-
D.
company
A company is an organized entity, legally recognized or informally structured, that coordinates people and resources to produce goods or services for customers, typically in pursuit of profit or specific objectives.
-
E.
transportation services company
A transportation services company is an organization that plans, manages, and operates the movement of people or goods using various modes of transport, such as road, rail, air, or sea, often providing logistics, scheduling, and support services.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a49919a994819086528951bc224775 |
completed | March 1, 2026, 7:52 p.m. |
Created at: March 1, 2026, 7:59 p.m.