Triple

T14100697
Position Surface form Disambiguated ID Type / Status
Subject Øresund Line E339371 entity
Predicate partOf P40 FINISHED
Object Øresund fixed link E222207 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Øresund fixed link | Statement: [Øresund Line, partOf, Øresund fixed link]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Øresund fixed link
Context triple: [Øresund Line, partOf, Øresund fixed link]
  • A. Øresund Bridge chosen
    The Øresund Bridge is a combined road and rail bridge–tunnel linking Denmark and Sweden across the Øresund strait, serving as a major transport corridor between Copenhagen and Malmö.
  • B. Fehmarn Sound Bridge
    The Fehmarn Sound Bridge is a prominent German road and rail bridge that links the island of Fehmarn with the mainland across the Fehmarn Sound in the Baltic Sea.
  • C. Öland Bridge
    Öland Bridge is a long road bridge in Sweden that spans the Kalmar Strait, linking the island of Öland with the mainland near the city of Kalmar.
  • D. Tjeldsund Bridge
    Tjeldsund Bridge is a major road bridge in northern Norway that connects the island of Hinnøya to the mainland, serving as an important regional transport link.
  • E. Fehmarnbelt Tunnel
    The Fehmarnbelt Tunnel is a planned immersed road and rail tunnel that will create a fixed link between Denmark and Germany across the Fehmarn Belt in the Baltic Sea.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c69b5c8819094aa1abf18302908 completed April 9, 2026, 9:38 p.m.
NER Named-entity recognition batch_69de5fba7c10819095b1299b7b4f0310 completed April 14, 2026, 3:39 p.m.
NED1 Entity disambiguation (via context triple) batch_69fd3243360c819084a524af2e452863 completed May 8, 2026, 12:45 a.m.
Created at: April 9, 2026, 10:22 p.m.