Triple
T14058320
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Snowy–Tumut Development |
E338275
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object | Snowy–Tumut–Murray integrated system |
E67510
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Snowy–Tumut–Murray integrated system | Statement: [Snowy–Tumut Development, partOf, Snowy–Tumut–Murray integrated system]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Snowy–Tumut–Murray integrated system Context triple: [Snowy–Tumut Development, partOf, Snowy–Tumut–Murray integrated system]
-
A.
Snowy Hydro Scheme
chosen
The Snowy Hydro Scheme is a large-scale hydroelectricity and irrigation complex in Australia’s Snowy Mountains, renowned as one of the country’s most significant engineering projects.
-
B.
Goulburn–Murray Irrigation District
Goulburn–Murray Irrigation District is a major agricultural irrigation region in northern Victoria, Australia, supplying water to extensive dairy, horticulture, and mixed farming enterprises.
-
C.
Churchill River hydroelectric system
The Churchill River hydroelectric system is a large-scale network of dams, reservoirs, and power stations in Labrador, Canada, developed to harness the Churchill River’s flow for electricity generation.
-
D.
Murray–Darling Basin water management system
The Murray–Darling Basin water management system is an integrated network of rivers, dams, and regulatory infrastructure designed to allocate, store, and manage water resources across southeastern Australia’s largest river basin for agriculture, communities, and the environment.
-
E.
Murrumbidgee Irrigation Area
The Murrumbidgee Irrigation Area is a major agricultural region in New South Wales, Australia, renowned for its extensive irrigation schemes that support fruit, rice, and other crop production.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d81c67ba6c819091935650dfb3b895 |
completed | April 9, 2026, 9:38 p.m. |
| NER | Named-entity recognition | batch_69de3c8e6d008190af8892f34c5cefbd |
completed | April 14, 2026, 1:09 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69fcb662c37c8190a629278a97060080 |
completed | May 7, 2026, 3:57 p.m. |
Created at: April 9, 2026, 10:20 p.m.