Triple

T14058320
Position Surface form Disambiguated ID Type / Status
Subject Snowy–Tumut Development E338275 entity
Predicate partOf P40 FINISHED
Object Snowy–Tumut–Murray integrated system E67510 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Snowy–Tumut–Murray integrated system | Statement: [Snowy–Tumut Development, partOf, Snowy–Tumut–Murray integrated system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Snowy–Tumut–Murray integrated system
Context triple: [Snowy–Tumut Development, partOf, Snowy–Tumut–Murray integrated system]
  • A. Snowy Hydro Scheme chosen
    The Snowy Hydro Scheme is a large-scale hydroelectricity and irrigation complex in Australia’s Snowy Mountains, renowned as one of the country’s most significant engineering projects.
  • B. Goulburn–Murray Irrigation District
    Goulburn–Murray Irrigation District is a major agricultural irrigation region in northern Victoria, Australia, supplying water to extensive dairy, horticulture, and mixed farming enterprises.
  • C. Churchill River hydroelectric system
    The Churchill River hydroelectric system is a large-scale network of dams, reservoirs, and power stations in Labrador, Canada, developed to harness the Churchill River’s flow for electricity generation.
  • D. Murray–Darling Basin water management system
    The Murray–Darling Basin water management system is an integrated network of rivers, dams, and regulatory infrastructure designed to allocate, store, and manage water resources across southeastern Australia’s largest river basin for agriculture, communities, and the environment.
  • E. Murrumbidgee Irrigation Area
    The Murrumbidgee Irrigation Area is a major agricultural region in New South Wales, Australia, renowned for its extensive irrigation schemes that support fruit, rice, and other crop production.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c67ba6c819091935650dfb3b895 completed April 9, 2026, 9:38 p.m.
NER Named-entity recognition batch_69de3c8e6d008190af8892f34c5cefbd completed April 14, 2026, 1:09 p.m.
NED1 Entity disambiguation (via context triple) batch_69fcb662c37c8190a629278a97060080 completed May 7, 2026, 3:57 p.m.
Created at: April 9, 2026, 10:20 p.m.