Triple

T1401521
Position Surface form Disambiguated ID Type / Status
Subject Gateway Transit Center E30793 entity
Predicate serves P98 FINISHED
Object TriMet E1080 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: TriMet | Statement: [Gateway Transit Center, serves, TriMet]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: TriMet
Context triple: [Gateway Transit Center, serves, TriMet]
  • A. TriMet chosen
    TriMet is the regional public transportation agency serving the Portland, Oregon metropolitan area, operating buses, light rail, and commuter rail services.
  • B. TriMet Zone 1
    TriMet Zone 1 was a former central fare zone in Portland’s public transit system that included areas such as the Lloyd District.
  • C. Lane Transit District
    Lane Transit District is the public transportation agency serving Eugene, Springfield, and surrounding communities in Lane County, Oregon, operating bus and bus rapid transit services.
  • D. Metro Transit
    Metro Transit is the primary public transportation agency for the Minneapolis–Saint Paul metropolitan area, operating buses, light rail, and commuter rail services.
  • E. Portland Bureau of Transportation
    The Portland Bureau of Transportation is the city agency responsible for planning, building, managing, and maintaining Portland, Oregon’s transportation infrastructure and services.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a498fd4e408190bd73eca30ea9754c completed March 1, 2026, 7:52 p.m.
NER Named-entity recognition batch_69a4c39da20c8190b9c82cc4ad747c66 completed March 1, 2026, 10:54 p.m.
NED1 Entity disambiguation (via context triple) batch_69acde3799f881908efb4ee73d412482 completed March 8, 2026, 2:25 a.m.
Created at: March 1, 2026, 7:59 p.m.