Triple

T1397401
Position Surface form Disambiguated ID Type / Status
Subject Quaid-e-Azam Day E30698 entity
Predicate instanceOf P0 FINISHED
Object public holiday in Pakistan C288 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: public holiday in Pakistan
Context triple: [Quaid-e-Azam Day, instanceOf, public holiday in Pakistan]
  • A. public holiday chosen
    A public holiday is a legally designated day on which work and school are generally suspended to allow the population to observe cultural, historical, religious, or national events.
  • B. national holiday
    A national holiday is a legally recognized day of celebration or commemoration on which a nation collectively observes significant historical, cultural, or religious events, often with reduced work and school obligations.
  • C. province of Pakistan
    A province of Pakistan is a primary administrative and political subdivision of the country, governed by its own provincial government under the framework of the Pakistani constitution.
  • D. commemorative day
    A commemorative day is a designated date set aside to remember, honor, or raise awareness about a specific person, event, cause, or cultural tradition.
  • E. Islamic month
    An Islamic month is one of the twelve lunar-based divisions of the Islamic calendar, beginning with the sighting of the new moon and used to determine religious observances and events in Islam.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a498fd4e408190bd73eca30ea9754c completed March 1, 2026, 7:52 p.m.
Created at: March 1, 2026, 7:59 p.m.