Triple
T1397166
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Pakistan (Provisional Constitution) Order 1947 |
E30692
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | interim constitution |
C271
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: interim constitution Context triple: [Pakistan (Provisional Constitution) Order 1947, instanceOf, interim constitution]
-
A.
constitutional convention
A constitutional convention is a formal gathering of representatives convened to draft, revise, or replace a constitution or fundamental governing framework of a political entity.
-
B.
provisional legislative body
A provisional legislative body is a temporary lawmaking assembly established to exercise legislative authority during a transitional or interim period before a permanent government structure is formed or restored.
-
C.
constitutional convention document
A constitutional convention document is the formal written record produced by a constitutional convention that outlines proposed or adopted foundational principles, governmental structures, and legal frameworks for a political entity.
-
D.
written constitution
chosen
A written constitution is a formal, codified document that outlines the fundamental principles, structures, powers, and limits of a government, as well as the rights and duties of its citizens.
-
E.
constitutional provision
A constitutional provision is a specific, authoritative rule or principle written into a constitution that defines the structure, powers, and limits of government and the rights of individuals.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a498fd4e408190bd73eca30ea9754c |
completed | March 1, 2026, 7:52 p.m. |
Created at: March 1, 2026, 7:59 p.m.