Triple
T13867789
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Oregon City Municipal Elevator |
E333370
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | public elevator |
C5027
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: public elevator Context triple: [Oregon City Municipal Elevator, instanceOf, public elevator]
-
A.
elevator
chosen
An elevator is a vertically moving transport device within a building that carries people or goods between different floors using a guided platform and mechanical lifting system.
-
B.
elevator code
Elevator code is the software logic and control system that manages an elevator’s movement, door operations, safety checks, and user requests within a building.
-
C.
escalator product line
An escalator product line is a range of escalator models and configurations offered by a manufacturer, varying in features such as size, capacity, speed, aesthetics, and intended application to meet diverse building and traffic requirements.
-
D.
floor of a building
A floor of a building is a horizontal structural level designed to support occupants and activities, typically bounded vertically by ceilings and/or other floors.
-
E.
elevator and escalator company
A company that designs, manufactures, installs, and maintains elevators, escalators, and related vertical transportation systems for buildings and public spaces.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d81c5ced9c8190b0e9bcc6effe5959 |
completed | April 9, 2026, 9:38 p.m. |
Created at: April 9, 2026, 10:14 p.m.