Triple

T13861189
Position Surface form Disambiguated ID Type / Status
Subject IBEX 35 E333199 entity
Predicate reviewMonths P6433 FINISHED
Object June LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: June | Statement: [IBEX 35, reviewMonths, June]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: reviewMonths
Context triple: [IBEX 35, reviewMonths, June]
  • A. monthObserved
    Indicates the month during which an event, observation, or measurement took place.
  • B. typicalMeetingMonth
    Indicates the month in which an entity most commonly or usually holds its meetings.
  • C. hasMonth chosen
    Indicates that something is associated with, occurs in, or is assigned to a specific month.
  • D. areReviewedEvery
    Indicates that one entity conducts reviews of another entity at every specified time interval or on every relevant occasion.
  • E. appliesDuringMonths
    Indicates that something is valid, active, or in effect only during specific months of the year.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c5ced9c8190b0e9bcc6effe5959 completed April 9, 2026, 9:38 p.m.
NER Named-entity recognition batch_69de23a101488190bd790b28033d38b9 completed April 14, 2026, 11:23 a.m.
PD Predicate disambiguation batch_69de05972f3881909977b4c843984f88 completed April 14, 2026, 9:15 a.m.
Created at: April 9, 2026, 10:14 p.m.