Triple
T1384584
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Minion Park |
E29815
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | amusement park land |
C6497
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: amusement park land Context triple: [Minion Park, instanceOf, amusement park land]
-
A.
theme park operator
A theme park operator is an entity responsible for managing and overseeing the daily operations, attractions, staff, safety, and guest experience within a theme park.
-
B.
roller coaster
A roller coaster is an amusement ride consisting of a track with steep drops, sharp turns, and inversions that carries passengers in open cars for a thrilling, high-speed experience.
-
C.
launched roller coaster
A launched roller coaster is a type of roller coaster that uses propulsion systems such as linear motors, hydraulic launches, or compressed air to rapidly accelerate trains to high speeds without relying on a traditional lift hill.
-
D.
dark ride
A dark ride is an indoor amusement attraction where passengers travel in guided vehicles through elaborately themed, low-light environments featuring scenes, special effects, and storytelling.
-
E.
entertainment complex
An entertainment complex is a large, multi-purpose facility that combines various leisure, recreational, and cultural attractions—such as cinemas, theaters, restaurants, gaming areas, and event spaces—within a single integrated venue.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a498dc92f8819094a1108f8ac90f43 |
completed | March 1, 2026, 7:51 p.m. |
Created at: March 1, 2026, 7:59 p.m.