Triple
T1377830
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Barton Swing Aqueduct |
E29265
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | swing aqueduct |
C6802
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: swing aqueduct Context triple: [Barton Swing Aqueduct, instanceOf, swing aqueduct]
-
A.
stone arch bridge
A stone arch bridge is a structure composed of curved stone arches that span a gap, using the compressive strength of masonry to support loads and provide passage over obstacles like rivers or valleys.
-
B.
suspension bridge
A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
-
C.
covered bridge
A covered bridge is a typically wooden, roofed structure that spans a waterway or gap, enclosing its roadway to protect the supporting framework from weather and extend its lifespan.
-
D.
steel arch bridge
A steel arch bridge is a structure that uses a curved steel arch as its main load-bearing element to span a distance and support traffic above.
-
E.
cantilever bridge
A cantilever bridge is a structure that spans a distance using projecting beams or trusses anchored at only one end, which extend outward to support the bridge deck without intermediate supports.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a498d883a48190bfdca525296ef7ee |
completed | March 1, 2026, 7:51 p.m. |
Created at: March 1, 2026, 7:59 p.m.