Triple
T1375017
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Shark River Slough |
E29201
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | freshwater flow-way |
C79
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: freshwater flow-way Context triple: [Shark River Slough, instanceOf, freshwater flow-way]
-
A.
waterway network
A waterway network is an interconnected system of natural and artificial water channels (such as rivers, canals, and streams) designed or utilized for the movement, distribution, and management of water and waterborne transport.
-
B.
navigable waterway
A navigable waterway is a natural or artificial body of water, such as a river, canal, or channel, that is deep and wide enough for vessels to travel safely for transportation or commerce.
-
C.
river
chosen
A river is a natural flowing body of water, usually freshwater, that moves continuously along a defined channel from higher elevations toward lower ones, often emptying into a sea, lake, or another river.
-
D.
watershed
A watershed is a land area that channels rainfall and snowmelt into streams and rivers, ultimately draining into a common outlet such as a larger river, lake, or ocean.
-
E.
freshwater lake
A freshwater lake is a naturally occurring inland body of standing water with low salt concentration, supporting diverse aquatic ecosystems and often serving as a critical resource for wildlife and human use.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a498d883a48190bfdca525296ef7ee |
completed | March 1, 2026, 7:51 p.m. |
Created at: March 1, 2026, 7:59 p.m.