Triple

T137398
Position Surface form Disambiguated ID Type / Status
Subject Washington Metropolitan Area Transit Authority E2776 entity
Predicate instanceOf P0 FINISHED
Object interstate compact agency C1091 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: interstate compact agency
Context triple: [Washington Metropolitan Area Transit Authority, instanceOf, interstate compact agency]
  • A. bi-state agency chosen
    A bi-state agency is a governmental or quasi-governmental organization jointly created and governed by two neighboring states to manage shared resources, infrastructure, or regulatory responsibilities across their common jurisdiction.
  • B. auxiliary Interstate Highway
    An auxiliary Interstate Highway is a shorter, supplementary route connected to a primary Interstate that typically serves to bypass, loop around, or provide direct access to urban areas.
  • C. independent regional agency
    An independent regional agency is an autonomous public or quasi-public organization that operates within a specific geographic region to plan, coordinate, and deliver specialized services or regulatory functions separate from direct control by central government bodies.
  • D. regional planning agency
    A regional planning agency is an organization responsible for coordinating land use, transportation, infrastructure, and environmental planning across multiple jurisdictions within a defined geographic region.
  • E. intergovernmental organization
    An intergovernmental organization is a formal entity created by sovereign states through treaties or agreements to cooperate on common interests, coordinate policies, and address international issues.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2521e35c08190b28e5c9f1e3c9b59 completed Feb. 28, 2026, 2:25 a.m.
Created at: Feb. 28, 2026, 2:31 a.m.