Triple

T1373597
Position Surface form Disambiguated ID Type / Status
Subject Trenton Line E30168 entity
Predicate electrifiedBy P5320 FINISHED
Object 25 kV AC (Northeast Corridor standard) LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 25 kV AC (Northeast Corridor standard) | Statement: [Trenton Line, electrifiedBy, 25 kV AC (Northeast Corridor standard)]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: electrifiedBy
Context triple: [Trenton Line, electrifiedBy, 25 kV AC (Northeast Corridor standard)]
  • A. electrificationSystem chosen
    Indicates the type of electrical power system used to supply energy (typically to infrastructure or vehicles) for operation.
  • B. electrification
    Indicates the process or state of providing electrical power or converting something to operate using electricity.
  • C. hasElectricCharge
    Indicates that an entity possesses a nonzero electric charge as a physical property.
  • D. electrificationCompleted
    Indicates that the process of providing electrical power infrastructure to the relevant entity or area has been fully completed.
  • E. electrificationEnd
    Indicates the point in time or event at which an electrification process or electrified state comes to an end.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a498f912008190a376a98b207b2071 completed March 1, 2026, 7:52 p.m.
NER Named-entity recognition batch_69a4c2f660888190bc9240e0dc4f0aa3 completed March 1, 2026, 10:51 p.m.
PD Predicate disambiguation batch_69a4befcabdc8190a9f05d002603f81c completed March 1, 2026, 10:34 p.m.
Created at: March 1, 2026, 7:57 p.m.