Triple

T1372535
Position Surface form Disambiguated ID Type / Status
Subject Right and Left E30144 entity
Predicate title P38 FINISHED
Object Right and Left E30144 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Right and Left | Statement: [Right and Left, title, Right and Left]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Right and Left
Context triple: [Right and Left, title, Right and Left]
  • A. Right and Left chosen
    "Right and Left" is a 1909 oil painting by American artist Winslow Homer depicting two ducks at the moment they are shot in mid-flight, noted for its dramatic composition and exploration of mortality.
  • B. Acción Republicana
    Acción Republicana was a left-liberal Spanish political party of the Second Republic era, best known as the main political vehicle of Manuel Azaña, who became prime minister and later president of Spain.
  • C. Union
    The Union was the federal government and Northern states of the United States that opposed the seceding Confederate states during the American Civil War.
  • D. Union
    Union is the commonly used short name for the Major League Soccer club Philadelphia Union.
  • E. Right Powerhouse
    Right Powerhouse is one of the major hydroelectric generating stations at the Grand Coulee Dam, housing multiple large turbines that contribute significantly to the dam’s overall power output.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a498f912008190a376a98b207b2071 completed March 1, 2026, 7:52 p.m.
NER Named-entity recognition batch_69a4c2f4889881908103473a0173e23f completed March 1, 2026, 10:51 p.m.
NED1 Entity disambiguation (via context triple) batch_69acd481de608190bed1dc385209320e completed March 8, 2026, 1:44 a.m.
Created at: March 1, 2026, 7:57 p.m.